Method for Assessing Implementation of Design Build Project Delivery System in Indonesian Road Infrastructure Projects (Cases Study : Balai Besar Pelaksanaan Jalan Nasional V)
August 2015
Ashri Maharani, Hitapriya Suprayitno, Herry Budianto

Metrics

  • Eye Icon 27 views
  • Download Icon 80 downloads
Metrics Icon 27 views  //  80 downloads
Method for Assessing Implementation of Design Build Project Delivery System in Indonesian Road Infrastructure Projects (Cases Study : Balai Besar Pelaksanaan Jalan Nasional V) Image
Abstract

Public infrastructure, particularly road infrastructure, has a strong linkage with the economic growth of a nation. Management of road infrastructure by the DG of Highways-Ministry for PW is currently implemented by using traditional methods of DBB contract system. Although DBB approach is considered more fair for the contractor, it may not be able to create more value for the Government. Long periods of procurement, often result in undesirable outcomes such as excessive cost, unsatisfactory quality and delays in implementation time. The DB project delivery system is expected to answer the above problem and therefore, there is a need to examine how to assess the feasibility of DB Contract implementation for road infrastructure projects under the authority of BBPJN V. This paper present the method assessment development

Full text
Show more arrow
 

Metrics

  • Eye Icon 27 views
  • Download Icon 80 downloads
Metrics Icon 27 views  //  80 downloads